Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 2.26pm, Thursday 30th July, 2020 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Earl Shilton |
Shared use facility stops abruptly with dismount / proceed on foot sign. Cyclists are then forced onto dual carriageway with HGV traffic.
Comments reflect the views of the original submitter only.